Development of methodology of alternative rationale for financial ensuring of bridges building

VUZF REVIEW 5 (1):43-49 (2020)
  Copy   BIBTEX

Abstract

The purpose of the article is to develop a methodology for alternative substantiation of financial support for bridge construction. To achieve the purpose, the following general scientific and special methods and techniques of research were used: “golden ratio” rule; systematization and generalization; generalization of the results of the analysis and the logical generation of conclusions. Initially, the article analyzed the state of bridge structures in Europe and Ukraine. Based on the analysis, a disappointing situation has been identified, namely that a significant ratio of bridges number require major overhaul or are in critical condition. During the research, the following tasks were solved, namely: physical wear of the bridge as a failure was considered; the feasibility of investing in reconstruction or new bridge construction was determined. For the purpose of rational use of financial resources, which are limited in the age of economic challenges, and on the basis of the rule of “golden proportion”, the maximum percentage of investment in reconstruction is determined. If the limit is exceeded, it is decided to build a new bridge. This result allows making an economically sound decision and evaluating the effectiveness of the invested resources. It is proved that if the wear index of the overhaul bridge construction is higher than the wear rate of the new bridge construction by λ2 / λ1, and the amount of funds for overhaul reaches 70% of the funds needed to build a new one, it is better to build a new bridge.

Other Versions

No versions found

Links

PhilArchive

External links

Setup an account with your affiliations in order to access resources via your University's proxy server

Through your library

Similar books and articles

Beyond evidence-based medicine: bridge-building a medicine of meaning.S. Buetow - 2002 - Journal of Evaluation in Clinical Practice 8 (2):103-108.
The Black Bridge of Ahwaz.Hassan Bazazzadeh - 2018 - TICCIH Bulletin 80:11.

Analytics

Added to PP
2020-04-12

Downloads
332 (#71,443)

6 months
98 (#69,678)

Historical graph of downloads
How can I increase my downloads?

Author's Profile

Maksym Bezpartochnyi
Lviv Polytechnic National University

Citations of this work

No citations found.

Add more citations

References found in this work

No references found.

Add more references