Case Study of Reactor Containment Building Construction in Nuclear Power Plant


Abstract
It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. Through a case study, this study performs a pre-study for the reduction of construction duration in nuclear power plant project based on construction process of the RCB. The actual data of the case study have been collected and analyze the process and the external wall drawings of the RCB with construction practitioners. As a result of that, it is necessary to modularize the external wall form for equipment hatch and to extend the height of one layer of the external wall form to reduce the construction duration of RCB. The results of this study will be utilized to reduce construction duration of the nuclear power plant. eww140929dxn
Keywords Nuclear Reactor  Reactor Containment Building   Nuclear Power Plant
Categories (categorize this paper)
Options
Edit this record
Mark as duplicate
Export citation
Find it on Scholar
Request removal from index
Revision history

Download options

Our Archive


Upload a copy of this paper     Check publisher's policy     Papers currently archived: 44,365
External links

Setup an account with your affiliations in order to access resources via your University's proxy server
Configure custom proxy (use this if your affiliation does not provide a proxy)
Through your library

References found in this work BETA

No references found.

Add more references

Citations of this work BETA

No citations found.

Add more citations

Similar books and articles

Nuclear Nightmares in the Philippines.William Beaver - 1994 - Journal of Business Ethics 13 (4):271 - 279.
Early Fault Detection and Signal Validation at the Loviisa Nuclear Power Plant.Heikki Jokineva, Loviisan Voimalaitos & Imatran Voima Oy - 1991 - Ai 1991 Frontiers in Innovative Computing for the Nuclear Industry Topical Meeting, Jackson Lake, Wy, Sept. 15-18, 1991 1.
A Farewell to Arts.D. C. Stove - 1986 - Quadrant 30 (5):8-11.
Experiences Gained From Developing and Integrating an Expert System and a Modern Graphic Display System for a Swedish Nuclear Power Plant Control Room.Torsten Foreman & Jan-Erik Stenmark - 1991 - Ai 1991 Frontiers in Innovative Computing for the Nuclear Industry Topical Meeting, Jackson Lake, Wy, Sept. 15-18, 1991 1.

Analytics

Added to PP index
2014-09-29

Total views
5 ( #1,027,949 of 2,271,753 )

Recent downloads (6 months)
1 ( #823,834 of 2,271,753 )