Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast

Complexity 2019:1-11 (2019)
  Copy   BIBTEX

Abstract

All projects take place within a context of uncertainty. That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long execution times, or the risks inherent in various fields like geology, hydrology, and structural, electrical, and mechanical engineering, among others. Such factors often lead to cost overruns and delays in projects of this type. This paper analyzes the efficiency of the Earned Value Management technique and its Earned Schedule extension, as means of forecasting costs and deadlines when applied to complex hydroelectric power production projects. It is worth noting that this analysis was based on simulation models applied to real-life projects. The results showed that cost forecasting becomes very accurate over time, whereas duration forecasting is not reliably accurate.

Links

PhilArchive



    Upload a copy of this work     Papers currently archived: 91,881

External links

Setup an account with your affiliations in order to access resources via your University's proxy server

Through your library

Similar books and articles

Organization of company cost management.G. A. Kononova & V. V. Tsiganov - 2013 - Liberal Arts in Russia 2 (3):285--292.
‘Darker than the Dungeon’: Music, Ambivalence, and the Carceral Subject.Chris Waller - 2018 - International Journal for the Semiotics of Law - Revue Internationale de Sémiotique Juridique 31 (2):275-299.

Analytics

Added to PP
2019-04-03

Downloads
16 (#906,655)

6 months
7 (#430,488)

Historical graph of downloads
How can I increase my downloads?